Projects

Hanging Rock path helicopter haulage

ClientMacedon Ranges Shire
LocationWoodend
Reconstruction of pedestrian footpaths and crushed rock walking tracks at the top of Hanging Rock, including specially designed steps and drains.

Project challenge

Massive amounts of crused rock, bags of cement, timber, fibre re-enforced concrete drains, drainage grates and steps had to be delivered to the top of Hanging Rock, which posed significant occupational health and safety challenges.

2MH solution

2MH Consulting work with suppliers to pile materials in a specific way so that everything could be transported safely via helicopter and delivered right to site at the top of Hanging Rock.
Location
Woodend
Region
Melbourne & Central Victoria
Sector
Local government
Project type
Parks & gardens, Reserves
2MH services
Project design & specification, Design management, Construction management, Project management
Outdoor infrastructure
Paths & paving, Water, Paths, Drainage